CHERRY ORCHARD ROAD

Service:

Mechanical & Electrical Engineering Design

Client:

Henley Construct

Location:

UK

Value:

£35.2M

INTRODUCTION:

Cherry Orchard is a 9-storey 116-unit affordable home development in Croydon by Optivo Housing Group which is being delivered by Henley Construct the construction arm of the Henley Homes Group.

This nine-storey development in Cherry Orchard Road will feature one-, two- and three-bedroom apartments and duplexes, and includes optimal construction design by reducing the overall number of units to improve daylight levels, overall building functionality, access and maintenance.

The development will be set across two linked blocks, with communal resident gardens at ground level. The homes will enjoy a contemporary specification and many will benefit from balconies and gardens, while eleven units will be wheelchair accessible.

The exciting wider transformation of Croydon is already well underway with an ambitious £5.25 billion regeneration programme.

“Croydon is an area undergoing significant change and we look forward to playing our part by delivering these genuinely affordable homes for Optivo at a time when they are needed most."

Aaron Usmani, Henley’s Construction Director (quote taken from Optivo news release 25.06.20)

EDC will be providing the Mechanical and Electrical Engineering Design Drawings to Construction Stage.

The estimated completion date for this project is April 2023.

Request a Callback

We work with our clients to ensure we are building towards a better and sustainable future.