New Build Educational Centre to cater for over 2000 students. Comprised of four blocks connected by POD’s.
EDC were responsible for the full M&E Design as well as preparing a 3D model of the M&E services throughout the entire building.
New Build Educational Centre to cater for over 2000 students. Comprised of four blocks connected by POD’s.
EDC were responsible for the full M&E Design as well as preparing a 3D model of the M&E services throughout the entire building.