INTRODUCTION
A 66,000 ft2 central sorting hub in Athlone, Co. Westmeath.
Incorporates a large warehouse sorting facility and 2 storey office block. A new state of the art conveyor sorting facility was installed requiring dual redundancy power supplies. I.T. systems are of utmost importance to Interlink and this required a second back up hub remote from the main building should anything ever go faulty with the main IT hub.