Projects

The Habour Central

London

Project Overview:

The Harbour Central development for Galliard Homes has transformed this previously derelict, empty, and unused site. It now offers over 900 new homes (35% affordable), a six-storey leisure facility, residential amenity spaces, gardens, and a new public square.

Located just south of Canary Wharf on the Isle of Dogs, this strategic location at the heart of the wider Millharbour Village Masterplan offered an opportunity to shape the future of this dynamic area of London while reconnecting with the Docklands’ vibrant past. New homes are provided in 7 new buildings ranging from 8 to 42 storeys creating defined street frontages to the north, east and west. The scheme has been designed from inception to completion.

EDC Scope of Works:

EDC was appointed to carry out the MEP installation drawings for both Fit-Out & Shell & Core MEP Packages for Harbour Central with delivery to BIM Level 2 maturity. This exciting development comprises of a total of 642 apartments divided across five residential buildings, along with a leisure complex. This development will provide a range of highly specified studio, one, two and three bedroom apartments along with 8 penthouse apartments; whilst the leisure complex will include a “Resident’s Club” with a proposed library, concierge, gym and spa, business suites and cinema. The focal point will be the Maine Tower offering 297 apartments, arranged over 42-storeys.

Galliard Homes
London
  • MEP Design
£220m
Previous project
Beal High School
Next project
Beal High School