EDC Fast Facts 5: Prefabricated Utility Cupboards (PUC’s)

Traditionally, the installation of MEP services within service cupboards in residential developments has caused challenges between the different trades; plumbing, electrical and ventilation contractors with space and time constraints.

It is common that re-work occurs in the service cupboards due to programming challenges which ultimately leads to additional cost to the main contractor.

In today’s deadline-driven construction industry, the PUCs meets these challenges and needs by offering an innovative and efficient way to safely build a complete packaged utility solution to the highest levels of quality.

This solution is designed to meet spatial constraints, vastly reduces project programme with mass offsite production and reduces project co-ordination across multiple trade services with a complete offsite manufactured product ready for installation.

 

TALK TO US

Stay in the know

Sign up to receive our monthly newsletter with all the latest news and insights Ireland and the UK delivered straight to your inbox.