Talgarth Road, Hammersmith, a magnificent development that consists of a 715 bed PBSA scheme with amenity spaces at the ground floor, there is also a 400-bedroom Premier Inn hotel adjacent to the student development as part of this scheme.

HG Construction
Hammersmith
MEP Design: Stage 2-5
Complete
Project Overview
The development will consist of a 715 bed PBSA scheme with amenity spaces at the ground floor, there is also a 400-bedroom Premier Inn hotel adjacent to the student development as part of this scheme.
Our Client
EDC was appointed from Stage 2 through to Stage 5 on the MEP design and energy services working collaboratively with HG Construction & HG M&E to ensure a smooth and efficient delivery of both projects during the construction phase. 

Our Scope

EDC was appointed to deliver the 400 Bed Premier Inn hotel on the south of the site and the 715 bed PBSA scheme on the north of the site. While adopting a fabric first approach on the energy strategy for both schemes we utilised a hybrid gas boiler and a central air source heat pump system to achieve the Part L & CO2 targets on the hotel. The hotel also adopted air source heat pumps to achieve the hot water loads and heating and colling via central air source heat pumps.

The PBSA scheme adopted a hybrid VRF system and an MVHR system to all rooms to achieve the Part L & CO2 targets. The PBSA building also adopted air source heat pumps to achieve the hot water load whilst the electrical demand for the development was also supplemented with a roof PV array. 

EDC was appointed from Stage 2 through to Stage 5 on the MEP design and energy services working collaboratively with HG Construction & HG M&E to ensure a smooth and efficient delivery of both projects during the construction phase. 